Complete Cost & Process Transparency

Upfront Fixed Pricing. Zero Hidden Extras.

We understand that demolition is the first critical step of your building journey. Getting a reliable, fixed quote prevents costly budget blowouts later on.

Understanding The Cost

What Influences House Demolition Costs in Perth?

Every property is unique. Here are the key variables our estimators review during your free site inspection.

Building Size & Materials

Double-brick homes require more processing than timber-framed structures, and two-storey dwellings need heavier high-reach equipment.

Asbestos Volume

Properties with extensive asbestos in ceilings, exterior cladding, or boundary fences require certified removal and tipping fees.

Site Access & Slopes

Narrow laneways, powerlines, overhead obstructions, or steep Perth hills block access can dictate machine selection.

Salvageable Materials

Viable character jarrah timber, clean face bricks, and reusable metal can offset project costs through our resource recovery network.

Price Match Promise

Have A Written Demolition Quote?

We promise to beat any comparable quote from a registered Class 2 licensed demolition contractor in Western Australia.

Send Us The Quote
Full Walkthrough

Detailed 8-Step Demolition Roadmap

Exactly how Mr Cut Demolition manages your property from day one to builder handover.

Day 1

Initial Project Consultation

We begin with a detailed discussion regarding your build timeline, property access, site constraints, and whether you are planning a knockdown rebuild or multi-lot subdivision.

Within 48 hours

Free On-Site Inspection & Fixed Quote

Our operations manager inspects the site in person. We evaluate materials, soil conditions, potential asbestos, and boundary walls to provide a fully transparent, fixed-price quote.

2-4 Weeks (Council dependent)

Council Demolition Permit (BA7)

We liaise with your local municipality (e.g. City of Stirling, Melville, Belmont, Joondalup) to obtain the mandatory BA7 Demolition Permit, including required rodent eradication certificates.

Prior to site entry

Service Abolishments & Disconnections

We manage the disconnection and abolishment of electricity (Western Power), gas supply (ATCO), and water isolation (Water Corporation) so the site is 100% safe for physical works.

Day 1 of physical work

Licensed Asbestos Safe Removal

All hazardous materials (eaves, fibro fences, vinyl, roofs) are safely removed by our licensed asbestos team before any heavy mechanical equipment touches the structure.

Days 2-3

Mechanical Demolition & Sorting

High-reach modern excavators equipped with hydraulic grabs and shears systematically take down the building while dedicated water sprays suppress airborne dust.

Day 4

Site Clearing & 90% Recycling

Debris is separated on-site. Clean bricks and concrete are crushed for road base, timber is salvaged, and green waste is mulched, keeping 90%+ out of WA landfills.

Day 5

Handover & Clearance Certificate

The site is raked level, soil tested if required, and issued with an official clearance certificate ready for soil compaction and slab pouring by your builder.